C/M Ant-Farm - Silo-Farm



C/M Ant-Farm - Silo-Farm


Using ground. Land for different purpose 

Boring out a tunnel bunker then an ant farm tree under 6-12 ft then down 2-25+ so tries safely with a map system for Energy - Growing production in a compact space 

Utilizing the most of an area then reinforcing safely as to not allow a cave in process through prioritization engineering while using all bored out materials for different purpose 


C/M CYPRESS MOTORS

Comments

Popular posts from this blog

C/M Piston-Punch Power-Sled

Copy-Paste. Job. H.I.3 2025

Reasons I had been in USA 1985-2024