C/M Tour Bus - Retrofit

 


C/M Tour Bus - Retrofit


NO MORE FUEL. NO MORE RECHARGING

Just get in & go. Replacement parts every 5-10 / 10-100+ Years for the Energy Plant separate from regular part maintenance 

Lighter weight system that is lower cost. Lower cost to install. Lower cost to maintain. Highly reliable 


PROCESS

Removing all components connected to the Energy Plant

Engine
Exhaust
Wiring
Specifics connected


MOTION ENGERY PLANT

600-1200+ HP 700-1300 Ft Lbs Torque  

Minimal Requirements: 

Piston-Punch
Switch-Back EV
Drop-Bounce
PZ Taps
PZ Sound
Solar

Wiring

EV Motors two - 300-600 HP
Altinators

Noise cancelling foam strategically placed


OPTIONAL

Regenerative Braking
Regenerative Tracks 

Air-Drum Brake-Accellerator 

Valve sequencing for a V8 - V12+ Sport sound + slight HP Gains 


ITEMS YOU CAN RETAIN

Traditional Air-Brake system 

Replacing the Traditional Air-Brake system requires use of Air-Drum Brake-Accellerator with separate Disc


ENERGY COST ANALYSIS 

2024-2028 Onward

In comparison for a new Regular Sized Pick-up Truck in 2024

400 km of range - Estimate

Energy Plants in Vehicle   

Gasoline tank $150
Diesel tank $165
Hybrid gas or diesel tank $90-110
EV Battery electric charging $15-75
Hydrogen $15-75
Piston-Punch $0 - Not Metered
Piston-Punch $0-25 - Metered
EV Battery electric charging with Piston-Punch $0-25

Switch-Back EV $0 - Not Metered 
Switch-Back EV $10-45 - Metered 

C/M Piston-Punch self charges & C/M Altinator to EV Battery extends range past 600-1000+ Km or longer with a Micro-Piston-Punch gaining over 1500-2000 Km before a recharge

Energy Costs:

Recharging equivalent 
Refueling equivalent 

Registration - Maintenance - Insurance - Licencing extra or "a separate situation"


COST TO TRANSITION 

Starting at $9999.99 - $49,999.99 or under $99,999.99

Automatic transmission + manual optional

Pairing to current transmissions 

Canadian Dollars 

$0-25 Average per 400 Km Unlimited Range 

A Commuter Vehicle conversion $4999.99 - $19,999.99 or less on average Canadian dollars


TOTAL BUS COSTS 

New Tour + Industrial + School Bus costs

$200,000 - $1.5 Million Canadian Dollar average

Used Tour + Industrial + School Bus costs

$75,000 - $750,000 Million Canadian Dollar average 

Your current Energy Plant + components can be ground down & used offering a slight discount in the new Energy Plant 


OPTIONAL RETROFITTING 

Cargo Vehicles 

- 10 - 25+ 

- 5 Ton

Semi-Truck & Trailers


SIMPLE DESIGN SOLUTION 

Micro-Batteries 

Air + Air-Compression 

Air Compression Battery 

Air catalyst to safe electricity to EV Motor or Hydraulic Motor

No fuel required. No charging required. Windshield Washer Fluid is now the most toxic substance with air conditioning - heating fluids unless you switch to a clean +50 - 50 climate pump for components & interior for all seasons & conditions 

No or minimal fire risk. No explosion risk


Learn How to Build - Piston-Punch Unlimited Range 

https://cmtransportation85.blogspot.com/2024/09/hi3-introduction-at-sydneys-space-cig.html

Piston-Punch

https://4bennettsjordannic.blogspot.com/2024/09/start-piston-shot-punch-company-or_5.html


C/M CYPRESS MOTORS 

Comments

Popular posts from this blog

C/M Piston-Punch Power-Sled

Copy-Paste. Job. H.I.3 2025

Reasons I had been in USA 1985-2024